Evaluation and Analysis of Factors Affecting Delaysin Large-Scale Complex Projects: CaseStudy of Oil Well Drilling
Abstract
The expansion of project scale typically leads to increased complexity,resulting in heightened uncertainty and challenges in predicting issues,evolving conditions, and unexpected opportunities that emerge and are recognized post-initiation. Economic development programs in a country allocate substantial financial resources to oil and energy projects to enhance social welfare and quality of life. Considering the value of these resources and the investment of time, executed projects must minimize delays to avoid the wastage of national capital and allocate resources effectively to enhance the country's economic prosperity. This study examines the drilling of oil wells as a megaproject, conducting research and investigation into this large-scale complex endeavour. According to expert opinions, researcher experience, and prior studies, three hypothetical factors are identifiedas the most significant contributors to project delays. The sample populationsize was determined to be 33 individuals through a comprehensive survey, andthe preliminary study results were employed using Cochran's formula and Morgan's table. A questionnaire comprising 49 questions was subsequently developed and formulated in accordance with the specified hypotheses. The questionnaire was randomly distributed and collected from the samplepopulation following verification of its validity and reliability. Statistical inference methods were utilized to examine and evaluate the hypotheses through the application of Student’s t-test. The results of the three hypothesesare presented according to their significance, ranked from the most influential factor (highest effect)to the least influential factor (lowest effect) on project duration. The three factors are summarized as follows: 1) performance of contractors, 2)performance of domestic producers, and 3) performance ofproject owners.
References
Audikana, A., Beria, P., & Arellano-Yanguas, J. (2024).Megaprojects: Beyond the managerial and activist traps.Environment and Planning C: Politics and Space, 23996544241274065.https://doi.org/10.1177/23996544241274.
Chishti, M. Z., & Sinha, A. (2022). Do the shocks in technological and financial innovation influenceth
Cevikbas, M., Okudan, O., & Işık, Z. (2024). Identification and assessment of disruption claim management risks in construction projects: a life cycle-based approach.Engineering, Construction and Architectural Management,31(1),1-27.https://doi.org/10.1108/ECAM-05-2022-0470.
Journal of Construction Management,23(7), 1109-1117.https://doi.org/10.1080/15623599.2021.1956294.
Shah, R., Kraidi, L., Matipa, W., & Borthwick,F. (2021, June). Investigation of the Risk FactorsCausing Safety and
Delay Issues in Oil and Gas Pipeline Construction Projects. InGlobal Congress on Manufacturing and Management (pp. 313-326). Cham: Springer International Publishing.https://doi.org/10.1007/978-3-030-90532-3_24.
https://doi.org/10.1108/JFMPC-02-2023-0008.
[14] Qian, Y., Yu, X. A., Chen, X., & Song, M. (2023). A model and simulation study of developers’ multicontract incentives
for contractors’ green technology innovation decisions considering marketing efforts and innovation capability.Energy & Environment, 0958305X231205022.https://doi.org/10.1177/0958305X231205022.
Babaeian Jelodar, M., Hemant Raut, P., & Saghatforoush, E. (2021). Contractor-delay control in building projects:
Escalation of strategy from primary proactive to secondary reactive.Journal of Legal Affairs and Dispute Resolution in Engineering and Construction,13(2), 04521002.https://doi.org/10.1061/(ASCE)LA.1943-4170.0000449.
Zhu, G., Chou, M. C., & Tsai, C. W. (2020). Lessons learned from the COVID-19 pandemic exposing the shortcomings
Downloads
Published
Issue
Section
License
Copyright (c) 2025 Spectrum of Engineering and Management Sciences

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.
Author(s) and co-author(s) jointly and severally represent and warrant that the Article is original with the author(s) and does not infringe any copyright or violate any other right of any third parties and that the Article has not been published elsewhere. Author(s) agree to the terms that the SEMS Journal will have the full right to remove the published article on any misconduct found in the published article.


All site content, except where otherwise noted, is licensed under the